Reference projects
Latest Reference Projects
See the latest reference projects from Australia
Master Builders Solutions Seven Hills Production Site Driveway
At the Master Builders Solutions Warehouse in Sydney, a damaged driveway joint needed repair. The MasterSeal CR 435 joint sealant was ideal, allowing resealing during working hours without site disruption.
Wheatstone Project Liquefied Natural Gas (LNG) Shore Trunkline Microtunnel
The Wheatstone Project processes gas from offshore fields and includes installing gas facilities both offshore and onshore. The MasterFlow grout delivery system solved issues with the Shore Trunkline Microtunnel.
Lion Nathan East Tamaki Brewery
The new brewery, known as Project Century, was designed for a 100-year lifespan with a focus on quality, performance, and reduced environmental impact. Ucrete DP by Master Builders Solutions was chosen for its versatility and durability.
Pluto Liquefied Natural Gas (LNG) Facility
Woodside, Australia's leading LNG operator, partnered with Tokyo Gas and Kansai Electric in 2005 to develop the Pluto LNG facility. They used MasterFlow precision and epoxy grouts with systems tailored to meet environmental and regulatory standards.
The Braggs Building
The Braggs Building at the University of Adelaide needed steel panels for radiation insulation. MasterFlow 4600 was the only grout that met the technical specifications for grouting concrete panels into wall voids.
Legacy Way Tunnel
The Transcity Joint Venture constructed the Legacy Way Tunnel in Brisbane. Small cross passages were built for evacuation and emergency services. Shotcrete for the tunnel lining was delivered to meet TJV’s continuous operation schedule.
Gorgon Liquified Natural Gas (LNG) Project
The Gorgon Project is one of the world's largest natural gas projects in Australia's history. The MasterFlow range was used during construction, with a range of environmental and regulatory challenges being considered.
Fonterra Milk Processing Plant
Milk processing plant Fonterra required a Ucrete DP flooring system that was able to withstand heavy traffic (foot and equipment), strict hygiene/cleaning standards, resistance to harsh chemicals and temperatures, and a safe slip-resistant surface.
Darlot Gold Mine
MasterRoc MF 505C used to increase the quality of paste fill, in order that paste development, side exposure and undercut curing times could be reduced and Lode 1 extraction rate increased.
City Reach Boardwalk, Brisbane River
O’Connor Kelly and Master Builders Solutions completed a refurbishment project at the City Reach Boardwalk utilising various MasterEmaco and MasterProtect products for both corrosion repairs and structural repairs.